AiroSignal
Asia

Taiwan Taoyuan International: project updates

AiroSignal tracked 2 opportunities at Taiwan Taoyuan International over the past 12 months, and 2 are still active. They break down into 2 project and funding signals. The most recent project signal, from 2 Nov 2026, is "Taoyuan International Airport · north runway maintenance" (phase: construction, owner: Taoyuan International Airport).

Active
2
Projects & funding
2
Last update
2 Nov 2026

Taiwan Taoyuan International at a glance

Passengers
47.8 million (2025)
Operator
Taoyuan International Airport Corporation
Owner
Government of the Republic of China
Opened
1979
Runways
2, longest 05L/23R at 3,660 m (12,008 ft)
Hub airlines
China Airlines, Uni Air, EVA Air, Starlux Airlines
IATA / ICAO
TPE / RCTP
Elevation
106 ft (32 m)

Airport facts: Wikidata (CC0) and OurAirports (public domain).

What is being bought at Taiwan Taoyuan International

Based on the 2 opportunities AiroSignal tracked here in the past 12 months.

Main themes

  • Infrastructure · 2

Upcoming projects & funding

Project, funding and policy signals at Taiwan Taoyuan International, newest first.

Source links, full summaries and match scores are in your free AiroSignal account: sign in with LinkedIn, it takes a minute.

Questions about Taiwan Taoyuan International

Is Taiwan Taoyuan International currently tendering?

No open or upcoming tender or notice is listed for Taiwan Taoyuan International right now. AiroSignal does track 2 project and funding signals there that can point to future procurement.

How long is the runway at Taiwan Taoyuan International?

Taiwan Taoyuan International has 2 runways. The longest, 05L/23R, is 3,660 m (12,008 ft) long, with a concrete surface. Other runways: 05R/23L at 3,350 m.

How many passengers does Taiwan Taoyuan International handle?

Taiwan Taoyuan International handled about 47.8 million passengers in 2025.

What projects are planned at Taiwan Taoyuan International?

AiroSignal has tracked 2 project and funding signals at Taiwan Taoyuan International in the past 12 months. The most recent are: "Taoyuan International Airport · north runway maintenance" (phase: construction) and "Taoyuan International Airport · Terminal 3 expansion" (phase: announced).

Get every Taiwan Taoyuan International tender and project signal in your weekly briefing

One briefing a week with the early signals and tenders that match your profile, plus a live dashboard in between. Free during development. No password required.