AiroSignal
Europe

Bilbao (BIO): projects, tenders & contracts

AiroSignal tracked 22 opportunities at Bilbao over the past 12 months, and 6 are still active. They break down into 6 tenders and notices and 16 contracts awarded. The most recent tender or notice, from 2 Oct 2026, is "Bilbao Airport · decennial fixed fire-extinguisher system recertification".

Active
6
Tenders & notices
6
Projects & funding
0
Contracts awarded
16
Last update
5 Oct 2026

Bilbao at a glance

Passengers
7.06 million (2025)
Operator
Aena
Opened
1955
Runways
2, longest 12/30 at 2,600 m (8,530 ft)
IATA / ICAO
BIO / LEBB
Elevation
138 ft (42 m)

Airport facts: Wikidata (CC0) and OurAirports (public domain).

What is being bought at Bilbao

Based on the 22 opportunities AiroSignal tracked here in the past 12 months.

Recurring buyers

  • Aena · 15 items

Largest known value

1174757 EUR

Bilbao Airport · taxiway C1 & C2 margin adjustment & marking

Award signal

Live tenders & prior notices

Tenders, prior notices, market consultations and supplier registrations at Bilbao, newest first.

  • Live tenderOpen ·

    Bilbao Airport · decennial fixed fire-extinguisher system recertification

    Deadline 19 Oct 2026

  • Live tenderOpen ·

    Bilbao Airport · HVAC filtration supply

    Deadline 8 Oct 2026

  • Live tenderOpen ·

    Bilbao Airport (BIO) · parking expansion P1 management and control equipment

    Deadline 19 Oct 2026

  • Live tenderOpen ·

    Bilbao Airport · terminal boarding-area railing renovation

    Deadline 19 Oct 2026

  • Live tenderOpen ·

    Bilbao Airport · technical project-management & documentation assistance

    Deadline 21 Oct 2026

  • Live tenderOpen ·

    Bilbao Airport · emergency vehicle parking area resurfacing

    Deadline 13 Oct 2026

Source links, full details and match scores are in your free AiroSignal briefing.

Contracts awarded

Awarded contracts at Bilbao, with the winning supplier and an estimated re-compete window where known.

  • Award signalAwarded ·

    Bilbao Airport · taxiway C1 & C2 margin adjustment & marking

    1174757 EUR · Owner: Aena · Deadline 13 Jun 2025

  • Award signalAwarded ·

    Bilbao Airport · taxiway D4 helicopter operations adaptation

    154577.27 EUR · Owner: Aena · Deadline 18 May 2026

  • Award signalAwarded ·

    Bilbao Airport · Sigidel digital control system maintenance service

    20400 EUR · Owner: Aena · Deadline 17 Jun 2024

  • Award signalAwarded ·

    Bilbao Airport · obstacle surveillance and control service

    45000 EUR · Owner: Aena · Dirección del Aeropuerto de Bilbao · Deadline 7 Jul 2026

  • Award signalAwarded ·

    Bilbao Airport · VHF radio band maintenance and equipment services

    6257 EUR · Owner: Aena · Dirección del Aeropuerto de Bilbao · Deadline 16 Sep 2024

  • Award signalAwarded ·

    Bilbao Airport · check-in counter scale-display system upgrade

    60000 EUR · Owner: Aena · Deadline 8 Jun 2026

  • Award signalAwarded ·

    Bilbao Airport · electrical equipment supply

    38400 EUR · Owner: Aena · Deadline 11 May 2026

  • Award signalAwarded ·

    Bilbao Airport · apron signage remodeling

    584984.83 EUR · Owner: Aena · Deadline 2 Nov 2023

  • Award signalAwarded ·

    Bilbao Airport · waterproofing of control-tower and radionavigation-aid structures

    124931.5 EUR · Owner: Aena · Deadline 27 Apr 2026

  • Award signalAwarded ·

    Bilbao Airport · Legionella compliance facility adaptation (RD 487-22)

    221184.41 EUR · Owner: Aena · Deadline 31 Mar 2026

  • Award signalAwarded ·

    Bilbao Airport · sectional doors regulatory compliance upgrade

    51040 EUR · Owner: Aena · Deadline 29 Jun 2026

  • Award signalAwarded ·

    Bilbao Airport · air-conditioning equipment upgrade for jet bridges

    13866 EUR · Owner: Aena · Deadline 7 Jan 2026

  • Award signalAwarded ·

    Bilbao Airport · control-tower restoration service

    48950 EUR · Owner: ENAIRE · Deadline 28 Jun 2022

  • Award signalAwarded ·

    Bilbao Airport · speed-measurement instrument calibration & verification service

    2031.75 EUR · Owner: Aena · Deadline 30 Oct 2023

  • Award signalAwarded ·

    Bilbao Airport · hangar sliding-door repair and repainting

    85364.11 EUR · Owner: Aena · Deadline 26 Mar 2026

Source links, full details and match scores are in your free AiroSignal briefing.

Questions about Bilbao

Is Bilbao currently tendering?

Yes. AiroSignal currently lists 6 open or upcoming tenders and notices at Bilbao. The most recent is "Bilbao Airport · decennial fixed fire-extinguisher system recertification", dated 2 Oct 2026, with a deadline of 19 Oct 2026.

How long is the runway at Bilbao?

Bilbao has 2 runways. The longest, 12/30, is 2,600 m (8,530 ft) long, with an asphalt surface. Other runways: 10/28 at 1,910 m.

How many passengers does Bilbao handle?

Bilbao handled about 7.06 million passengers in 2025.

Who has won recent contracts at Bilbao?

AiroSignal tracked 16 contract awards at Bilbao in the past 12 months. The most recent are: "Bilbao Airport · taxiway C1 & C2 margin adjustment & marking" (5 Oct 2026), "Bilbao Airport · taxiway D4 helicopter operations adaptation" (28 Sep 2026) and "Bilbao Airport · Sigidel digital control system maintenance service" (15 Sep 2026).

Get every Bilbao tender and project signal in your weekly briefing

Free for the first 100 sign-ups. One briefing a week with the early signals and tenders that match your profile, plus a live dashboard in between. No password required.