AiroSignal
Africa

Roland Garros (RUN): projects, tenders & contracts

AiroSignal tracked 7 opportunities at Roland Garros over the past 12 months, and 6 are still active. They break down into 6 tenders and notices and 1 contract awarded. The most recent tender or notice, from 2 Oct 2026, is "France: Roland Garros La Réunion Airport · departure terminal hall & check-in rehabilitation".

Active
6
Tenders & notices
6
Projects & funding
0
Contracts awarded
1
Last update
2 Oct 2026

Roland Garros at a glance

Opened
1929
Runways
2, longest 12/30 at 3,200 m (10,499 ft)
Hub airlines
Air Austral
IATA / ICAO
RUN / FMEE
Elevation
66 ft (20 m)

Airport facts: Wikidata (CC0) and OurAirports (public domain).

What is being bought at Roland Garros

Based on the 7 opportunities AiroSignal tracked here in the past 12 months.

Largest known value

EUR 730,268

France: Roland Garros (RUN) · passenger terminal rehabilitation & check-in area masterworks

Award signal

Live tenders & prior notices

Tenders, prior notices, market consultations and supplier registrations at Roland Garros, newest first.

  • Live tenderOpen ·

    France: Roland Garros La Réunion Airport · departure terminal hall & check-in rehabilitation

  • Live tenderOpen ·

    France: Roland Garros Airport (La Réunion) · IT equipment renewal

  • Live tenderOpen ·

    France: Roland Garros Airport (Saint-Denis, Réunion) · CRM software solution provision

  • Live tenderOpen ·

    France: La Réunion Roland Garros Airport · maintenance framework agreement (Lots 2-3)

  • Live tenderOpen ·

    France: Roland Garros Airport (Réunion) · aircraft-stand lighting works (P1-P17)

  • Live tenderOpen ·

    France: La Réunion Roland Garros · CCTV supervision system replacement and extension

Source links, full details and match scores are in your free AiroSignal briefing.

Contracts awarded

Awarded contracts at Roland Garros, with the winning supplier and an estimated re-compete window where known.

  • Award signalAwarded ·

    France: Roland Garros (RUN) · passenger terminal rehabilitation & check-in area masterworks

    EUR 730,268

Source links, full details and match scores are in your free AiroSignal briefing.

Questions about Roland Garros

Is Roland Garros currently tendering?

Yes. AiroSignal currently lists 6 open or upcoming tenders and notices at Roland Garros. The most recent is "France: Roland Garros La Réunion Airport · departure terminal hall & check-in rehabilitation", dated 2 Oct 2026.

How long is the runway at Roland Garros?

Roland Garros has 2 runways. The longest, 12/30, is 3,200 m (10,499 ft) long, with an asphalt surface. Other runways: 14/32 at 2,670 m.

Who has won recent contracts at Roland Garros?

AiroSignal tracked 1 contract award at Roland Garros in the past 12 months. The most recent is: "France: Roland Garros (RUN) · passenger terminal rehabilitation & check-in area masterworks" (2 Oct 2026).

Get every Roland Garros tender and project signal in your weekly briefing

Free for the first 100 sign-ups. One briefing a week with the early signals and tenders that match your profile, plus a live dashboard in between. No password required.