AiroSignal
Latin America

Ezeiza International Airport - Ministro Pistarini: project updates

AiroSignal tracked 2 opportunities at Ezeiza International Airport - Ministro Pistarini over the past 12 months, and 2 are still active. They break down into 2 project and funding signals. The most recent project signal, from 7 Nov 2026, is "Ezeiza International Airport · main runway overhaul (3,300m → 1,850m, through November 11)" (phase: construction).

Active
2
Projects & funding
2
Last update
7 Nov 2026

Ezeiza International Airport - Ministro Pistarini at a glance

Passengers
11.9 million (2025)
Operator
Aeropuertos Argentina
Opened
1949
Runways
2, longest 11/29 at 3,300 m (10,827 ft)
IATA / ICAO
EZE / SAEZ
Elevation
67 ft (20 m)

Airport facts: Wikidata (CC0) and OurAirports (public domain).

What is being bought at Ezeiza International Airport - Ministro Pistarini

Based on the 2 opportunities AiroSignal tracked here in the past 12 months.

Main themes

  • Infrastructure · 2

Upcoming projects & funding

Project, funding and policy signals at Ezeiza International Airport - Ministro Pistarini, newest first.

Source links, full summaries and match scores are in your free AiroSignal account: sign in with LinkedIn, it takes a minute.

Questions about Ezeiza International Airport - Ministro Pistarini

Is Ezeiza International Airport - Ministro Pistarini currently tendering?

No open or upcoming tender or notice is listed for Ezeiza International Airport - Ministro Pistarini right now. AiroSignal does track 2 project and funding signals there that can point to future procurement.

How long is the runway at Ezeiza International Airport - Ministro Pistarini?

Ezeiza International Airport - Ministro Pistarini has 2 runways. The longest, 11/29, is 3,300 m (10,827 ft) long, with an asphalt surface. Other runways: 17/35 at 3,105 m.

How many passengers does Ezeiza International Airport - Ministro Pistarini handle?

Ezeiza International Airport - Ministro Pistarini handled about 11.9 million passengers in 2025.

What projects are planned at Ezeiza International Airport - Ministro Pistarini?

AiroSignal has tracked 2 project and funding signals at Ezeiza International Airport - Ministro Pistarini in the past 12 months. The most recent are: "Ezeiza International Airport · main runway overhaul (3,300m → 1,850m, through November 11)" (phase: construction) and "Ezeiza International Airport · runway resurfacing project" (phase: construction).

Get every Ezeiza International Airport - Ministro Pistarini tender and project signal in your weekly briefing

One briefing a week with the early signals and tenders that match your profile, plus a live dashboard in between. Free during development. No password required.